
-- Story
Repair narrative
Falcon door fitment was corrected after hinge-side impact. HV protocol was followed before structural verification.
11Days
35OEM parts
3Scan reports
$38,200Carrier billed
Before
AfterDay 00Intake & pre-scanPre-repair scan and photo damage document submitted to carrier
Day 02Estimate approvedOEM parts ordered and supplement packet opened
Day 04Disassembly completeHidden damage verified and repair plan locked
Day 07Structural repairPanel sectioning, bonding, welds, and measurements completed
Day 09RefinishSpectrophotometer match and adjacent-panel blend
Day 11ADAS calibrationStatic and dynamic calibration reports archived
Day 12QC + deliveryRoad test, final detail, post-scan, and concierge delivery
